Growing cheese packager expands into renovated state-of-the-art production facility
National Construction completed a project for Alpine Slicing & Cheese Conversion that included 54,700 square feet of remodeling and 8,300 square feet of new construction.
The new production area was designed for compliance with food safety standards. Everything was designed for efficiency, easy cleaning and sanitation:
Climate and humidity control
Automatic hand-washing and boot-cleaning machines
Special washable fabric ductwork
Pillars wrapped in stainless steel
Self-contained and enclosed light fixtures
Epoxy floor finish
State-of-the-art machinery for cheese slicing and packaging
Custom mechanical engineering to determine and meet the correct air exchange rates and equipment loads for heavy machinery.
After production, the packaged cheese passes through metal detectors into a different climate-controlled room for boxing, storage and shipping. The shipping cooler has triple push-back racks to maximize storage.
Production room
Production room
Production room
Boxing room
Hand and boot washers with boot sanitizing powder on floor
Chemical storage with automatic eye wash
Shipping cooler
The facility was improved in several ways to maximize productivity and security. The production and boxing areas were designed with a climate-controlled interstitial space above them to allow access to mechanicals for maintenance and repair without having to breach the contained sanitation areas. The boiler room was designed with built-in redundancy, and all new electrical and transformers were added to the facility. A new security room shows feeds from 150 cameras.
Access to interstitial space at top
Boiler room
Electrical transformers
Security room
The shipping and receiving areas were updated to allow truck drivers to enter the facility and have access to a designated bathroom without having to wear personal protective equipment. Two large windows allow drivers to observe their trucks being loaded or unloaded from the waiting area. The dock has pitless dock levelers to facilitate cleaning.
Receiving office and waiting room
Pitless dock levelers
Receiving dock
Dry goods, labeling, packaging
Employee-focused areas of the facility were significantly improved. National remodeled the cafeteria in the facility’s signature cherry red color with diner-style stools, a polished concrete floor, and video screens for daily announcements. The restrooms were totally remodeled and include a large touchless hand washing area. A new training room and the employee locker rooms and uniform check-in area were also remodeled.
Employee cafeteria
Touchless hand wash station
Employee locker room
Employee uniform check-in
Employee training room
The exterior of the facility was significantly improved with an all-new facade, siding, paint, asphalt and concrete. National covered the existing masonry walls with two-inch insulated panels and fire-treated plywood, then coated them with liquid moisture barrier and metal siding. The project included new entrances, retaining walls, shipping docks, fire exits, and a self-contained trash system.
Before and after
Facility set up for next phase of expansion
New asphalt and siding
Self-contained trash system and shipping dock
Shipping dock
New siding and fire exits
Employee entrance
Receiving docks
Aerial view
Aerial view
Aerial view
Aerial view
Aerial view
This project allows Alpine Slicing & Cheese Conversion to operate efficiently with state-of-the-art machinery in a facility that is already set up for their next stage of growth.