A new building accommodates Mount Horeb firm’s rapid growth since its 2014 founding by Principal and Project Manager Wade P. Wyse.
National Construction built a 4,130 square foot, two-story office building for Wyser Engineering. The exterior of the building is a combination of brick and composite siding and trim. A parking area also provides space for playing basketball.
Parking area in front
Side view
Plentiful large windows allow natural light into the building. Some interior spaces feature reclaimed wood beams taken from old barns that the owner and his father tore down. Other interior spaces include:
Reception area with seating
Open work spaces
Kitchenette with refrigerator, sink, microwave, cabinets and countertops
Private office spaces
Bathrooms
Storage room with an overhead door
Conference room featuring a live-edge walnut table, made of reclaimed wood from the owner’s family farm.
Reception area
Open work space
Work space with kitchenette
Conference room with reclaimed beams
Live-edge table
Staircase
Second-floor work area
Windows allow natural light inside.
Office with reclaimed beams
The project was completed safely during the COVID-19 pandemic, on schedule and within budget.
Like What You See?
Let's get in touch and chat about your next project.